The ITAC Statistics page displays the average assessment results for the selected criteria.
5
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $62k | 6.5k |
MMBtu
|
$9.49 |
- Electrical | $49k | 605k |
kWh
|
$0.083 |
- Natural Gas | $3.1k | 0.3k |
MMBtu
|
$2.14 |
18
Recommendations
3.6
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $18k | 2.2k |
MMBtu
|
34.3% |
- Electrical | $17k | 217k |
kWh
|
35.9% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $18k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
3
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $60k | 6.3k |
MMBtu
|
$9.52 |
- Electrical | $48k | 568k |
kWh
|
$0.085 |
- Natural Gas | $5.2k | 0.5k |
MMBtu
|
$3.57 |
6
Implemented Recommendations
2.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $8.6k | 1.0k |
MMBtu
|
15.6% |
- Electrical | $8.3k | 96k |
kWh
|
16.9% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $8.6k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |