Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Business, professional, labor, political, and similar organizations
SIC 2+ Digits Required
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $65k 6.6k
MMBtu
$9.74
- Electrical $51k 612k
kWh
$0.084
- Natural Gas $3.4k 0.4k
MMBtu
$2.82

22

Recommendations

3.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 4.1k
MMBtu
61.2%
- Electrical $34k 397k
kWh
64.8%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $55k 5.8k
MMBtu
$9.50
- Electrical $45k 532k
kWh
$0.085
- Natural Gas $3.9k 0.4k
MMBtu
$2.68

8

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.0k 0.9k
MMBtu
15.7%
- Electrical $7.7k 89k
kWh
16.7%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $8.0k
*May be negative reflecting an increased cost component required to save energy and costs overall