The ITAC Statistics page displays the average assessment results for the selected criteria.
12
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $37k | 3.1k |
MMBtu
|
$13.42 |
- Electrical | $20k | 190k |
kWh
|
$0.13 |
- Natural Gas | $11k | 1.1k |
MMBtu
|
$113.96 |
57
Recommendations
4.8
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $10k | 0.8k |
MMBtu
|
27.3% |
- Electrical | $9.1k | 82k |
kWh
|
43.0% |
- Natural Gas | $0.6k | - |
MMBtu
|
- |
Waste | $0.1k | |||
Productivity/Other | $0.6k | |||
TOTAL | $11k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
5
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $46k | 3.8k |
MMBtu
|
$13.27 |
- Electrical | $25k | 197k |
kWh
|
$0.16 |
- Natural Gas | $19k | 1.8k |
MMBtu
|
$259.46 |
7
Implemented Recommendations
1.4
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $1.5k | 0.1k |
MMBtu
|
3.1% |
- Electrical | $1.2k | 12k |
kWh
|
5.9% |
- Natural Gas | $0.2k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.1k | |||
TOTAL | $1.7k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |