ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Religious, grantmaking, civic, professional, and similar organizations
SIC 2+ Digits Required
3+ Characters Required for Products

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $68k 5.9k
MMBtu
$12.17
- Electrical $48k 476k
kWh
$0.12
- Natural Gas $10k 1.0k
MMBtu
$58.54

108

Recommendations

4.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.4k
MMBtu
40.9%
- Electrical $25k 234k
kWh
49.2%
- Natural Gas $1.2k -
MMBtu
-
Waste $0.1k
Productivity/Other $0.3k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall

16

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $45k 4.1k
MMBtu
$12.45
- Electrical $31k 308k
kWh
$0.12
- Natural Gas $9.2k 0.9k
MMBtu
$85.51

25

Implemented Recommendations

1.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $4.3k 0.4k
MMBtu
10.8%
- Electrical $4.1k 43k
kWh
13.9%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other $0.0k
TOTAL $4.3k
*May be negative reflecting an increased cost component required to save energy and costs overall