ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Religious, grantmaking, civic, professional, and similar organizations
SIC 2+ Digits Required
3+ Characters Required for Products

23

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $50k 4.6k
MMBtu
$12.10
- Electrical $35k 361k
kWh
$0.12
- Natural Gas $9.3k 0.9k
MMBtu
$62.63

100

Recommendations

4.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.1k
MMBtu
45.2%
- Electrical $21k 202k
kWh
55.9%
- Natural Gas $0.9k -
MMBtu
-
Waste $0.1k
Productivity/Other $0.3k
TOTAL $22k
*May be negative reflecting an increased cost component required to save energy and costs overall

15

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $44k 4.0k
MMBtu
$12.53
- Electrical $31k 304k
kWh
$0.12
- Natural Gas $9.1k 0.9k
MMBtu
$90.25

23

Implemented Recommendations

1.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3.3k 0.3k
MMBtu
8.5%
- Electrical $3.1k 34k
kWh
11.0%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other $0.0k
TOTAL $3.3k
*May be negative reflecting an increased cost component required to save energy and costs overall