ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Religious, grantmaking, civic, professional, and similar organizations
SIC 2+ Digits Required
3+ Characters Required for Products

13

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $50k 4.8k
MMBtu
$11.32
- Electrical $33k 369k
kWh
$0.12
- Natural Gas $10k 1.0k
MMBtu
$103.08

52

Recommendations

4.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.3k
MMBtu
28.4%
- Electrical $12k 132k
kWh
35.7%
- Natural Gas $0.6k -
MMBtu
-
Waste $0.1k
Productivity/Other $0.3k
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $55k 4.9k
MMBtu
$12.92
- Electrical $34k 322k
kWh
$0.12
- Natural Gas $17k 1.6k
MMBtu
$258.58

9

Implemented Recommendations

1.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $6.1k 0.7k
MMBtu
13.9%
- Electrical $5.7k 67k
kWh
20.6%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $6.2k
*May be negative reflecting an increased cost component required to save energy and costs overall