ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Religious, grantmaking, civic, professional, and similar organizations
SIC 2+ Digits Required
3+ Characters Required for Products

19

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $47k 4.4k
MMBtu
$12.12
- Electrical $32k 346k
kWh
$0.11
- Natural Gas $8.5k 0.8k
MMBtu
$73.29

81

Recommendations

4.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.3k
MMBtu
28.7%
- Electrical $12k 123k
kWh
35.4%
- Natural Gas $0.4k -
MMBtu
-
Waste $0.1k
Productivity/Other $0.4k
TOTAL $13k
*May be negative reflecting an increased cost component required to save energy and costs overall

13

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $46k 4.3k
MMBtu
$12.62
- Electrical $33k 329k
kWh
$0.13
- Natural Gas $9.1k 0.9k
MMBtu
$102.79

23

Implemented Recommendations

1.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3.8k 0.4k
MMBtu
9.3%
- Electrical $3.6k 39k
kWh
11.8%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $3.9k
*May be negative reflecting an increased cost component required to save energy and costs overall