The ITAC Statistics page displays the average assessment results for the selected criteria.
17
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $44k | 4.1k |
MMBtu
|
$12.27 |
- Electrical | $28k | 312k |
kWh
|
$0.12 |
- Natural Gas | $8.8k | 0.9k |
MMBtu
|
$81.07 |
75
Recommendations
4.4
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $13k | 1.2k |
MMBtu
|
30.6% |
- Electrical | $11k | 121k |
kWh
|
38.9% |
- Natural Gas | $0.5k | - |
MMBtu
|
- |
Waste | $0.1k | |||
Productivity/Other | $0.4k | |||
TOTAL | $13k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
9
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $50k | 4.7k |
MMBtu
|
$11.59 |
- Electrical | $34k | 346k |
kWh
|
$0.13 |
- Natural Gas | $12k | 1.2k |
MMBtu
|
$145.34 |
15
Implemented Recommendations
1.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $4.4k | 0.5k |
MMBtu
|
10.0% |
- Electrical | $4.1k | 46k |
kWh
|
13.3% |
- Natural Gas | $0.1k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.1k | |||
TOTAL | $4.5k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |