ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Linen supply
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,070k 150k
MMBtu
$6.90
- Electrical $423k 4,009k
kWh
$0.096
- Natural Gas $644k 109k
MMBtu
$6.06

14

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $177k 5.0k
MMBtu
3.3%
- Electrical $55k 491k
kWh
12.2%
- Natural Gas $120k -
MMBtu
-
Waste $61k
Productivity/Other $13k
TOTAL $251k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,070k 150k
MMBtu
$6.90
- Electrical $423k 4,009k
kWh
$0.096
- Natural Gas $644k 109k
MMBtu
$6.06

8

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 4.7k
MMBtu
3.1%
- Electrical $50k 455k
kWh
11.3%
- Natural Gas $5.8k -
MMBtu
-
Waste $35k
Productivity/Other $13k
TOTAL $106k
*May be negative reflecting an increased cost component required to save energy and costs overall