The ITAC Statistics page displays the average assessment results for the selected criteria.
11
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $537k | 66k |
MMBtu
|
$9.09 |
- Electrical | $189k | 1,981k |
kWh
|
$0.090 |
- Natural Gas | $295k | 44k |
MMBtu
|
$7.71 |
82
Recommendations
7.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $118k | 7.0k |
MMBtu
|
10.7% |
- Electrical | $66k | 683k |
kWh
|
34.5% |
- Natural Gas | $40k | - |
MMBtu
|
- |
Waste | $15k | |||
Productivity/Other | $2.7k | |||
TOTAL | $136k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
9
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $516k | 72k |
MMBtu
|
$7.38 |
- Electrical | $207k | 2,239k |
kWh
|
$0.083 |
- Natural Gas | $277k | 49k |
MMBtu
|
$5.98 |
24
Implemented Recommendations
2.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $14k | 1.1k |
MMBtu
|
1.6% |
- Electrical | $12k | 110k |
kWh
|
4.9% |
- Natural Gas | $1.5k | - |
MMBtu
|
- |
Waste | $9.4k | |||
Productivity/Other | $24k | |||
TOTAL | $48k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |