The ITAC Statistics page displays the average assessment results for the selected criteria.
15
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $485k | 57k |
MMBtu
|
$9.55 |
- Electrical | $166k | 1,751k |
kWh
|
$0.089 |
- Natural Gas | $266k | 39k |
MMBtu
|
$8.05 |
107
Recommendations
7.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $102k | 5.6k |
MMBtu
|
9.7% |
- Electrical | $52k | 542k |
kWh
|
31.0% |
- Natural Gas | $40k | - |
MMBtu
|
- |
Waste | $12k | |||
Productivity/Other | $2.7k | |||
TOTAL | $117k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
12
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $501k | 62k |
MMBtu
|
$8.77 |
- Electrical | $186k | 1,921k |
kWh
|
$0.091 |
- Natural Gas | $272k | 42k |
MMBtu
|
$7.26 |
38
Implemented Recommendations
3.2
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $21k | 1.4k |
MMBtu
|
2.2% |
- Electrical | $16k | 134k |
kWh
|
7.0% |
- Natural Gas | $2.4k | - |
MMBtu
|
- |
Waste | $7.7k | |||
Productivity/Other | $19k | |||
TOTAL | $48k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |