ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Personal and laundry services
SIC 2+ Digits Required
3+ Characters Required for Products

13

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $502k 60k
MMBtu
$9.28
- Electrical $176k 1,826k
kWh
$0.091
- Natural Gas $279k 40k
MMBtu
$8.01

94

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $106k 6.1k
MMBtu
10.2%
- Electrical $58k 595k
kWh
32.6%
- Natural Gas $38k -
MMBtu
-
Waste $13k
Productivity/Other $3.1k
TOTAL $123k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $479k 64k
MMBtu
$7.91
- Electrical $189k 2,009k
kWh
$0.085
- Natural Gas $261k 43k
MMBtu
$6.65

34

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 1.1k
MMBtu
1.7%
- Electrical $11k 108k
kWh
5.4%
- Natural Gas $2.6k -
MMBtu
-
Waste $8.4k
Productivity/Other $21k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall