ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Repair and maintenance
SIC 2+ Digits Required
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $267k 27k
MMBtu
$11.20
- Electrical $142k 2,232k
kWh
$0.074
- Natural Gas $29k 4.3k
MMBtu
$5.61

72

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 4.5k
MMBtu
16.6%
- Electrical $30k 441k
kWh
19.8%
- Natural Gas $1.5k -
MMBtu
-
Waste -
Productivity/Other $1.3k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $308k 31k
MMBtu
$11.83
- Electrical $162k 2,558k
kWh
$0.075
- Natural Gas $34k 5.1k
MMBtu
$5.46

25

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 3.0k
MMBtu
9.4%
- Electrical $21k 288k
kWh
11.3%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall