ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Casino hotels
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,307k 355k
MMBtu
$6.50
- Electrical $1,189k 29,585k
kWh
$0.040
- Natural Gas $275k 42k
MMBtu
$6.52

16

Recommendations

16.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $242k 12k
MMBtu
3.3%
- Electrical $45k 1,128k
kWh
3.8%
- Natural Gas $114k -
MMBtu
-
Waste -
Productivity/Other $20k
TOTAL $262k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,307k 355k
MMBtu
$6.50
- Electrical $1,189k 29,585k
kWh
$0.040
- Natural Gas $275k 42k
MMBtu
$6.52

8

Implemented Recommendations

8.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 5.7k
MMBtu
1.6%
- Electrical $22k 554k
kWh
1.9%
- Natural Gas $11k -
MMBtu
-
Waste -
Productivity/Other $21k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall