ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Hotels (except casino hotels) and motels
SIC 2+ Digits Required
3+ Characters Required for Products

23

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $454k 48k
MMBtu
$11.97
- Electrical $253k 3,573k
kWh
$0.086
- Natural Gas $98k 11k
MMBtu
$7.89

119

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $68k 5.4k
MMBtu
11.2%
- Electrical $51k 527k
kWh
14.7%
- Natural Gas $13k -
MMBtu
-
Waste $3.5k
Productivity/Other $0.3k
TOTAL $72k
*May be negative reflecting an increased cost component required to save energy and costs overall

13

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $531k 65k
MMBtu
$10.45
- Electrical $317k 4,833k
kWh
$0.084
- Natural Gas $116k 15k
MMBtu
$6.19

29

Implemented Recommendations

2.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.4k
MMBtu
5.3%
- Electrical $29k 335k
kWh
6.9%
- Natural Gas $4.1k -
MMBtu
-
Waste $0.1k
Productivity/Other $0.4k
TOTAL $35k