ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Hotels (except casino hotels) and motels
SIC 2+ Digits Required
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $502k 61k
MMBtu
$10.40
- Electrical $301k 4,590k
kWh
$0.082
- Natural Gas $109k 14k
MMBtu
$6.72

70

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 6.7k
MMBtu
11.0%
- Electrical $52k 656k
kWh
14.3%
- Natural Gas $8.1k -
MMBtu
-
Waste $0.3k
Productivity/Other $0.3k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $556k 68k
MMBtu
$10.28
- Electrical $336k 5,160k
kWh
$0.083
- Natural Gas $121k 16k
MMBtu
$6.04

29

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.7k
MMBtu
5.4%
- Electrical $31k 363k
kWh
7.0%
- Natural Gas $4.5k -
MMBtu
-
Waste $0.1k
Productivity/Other $0.4k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall