ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Traveler accommodation
SIC 2+ Digits Required
3+ Characters Required for Products

13

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $691k 90k
MMBtu
$9.99
- Electrical $402k 7,039k
kWh
$0.079
- Natural Gas $133k 18k
MMBtu
$6.08

72

Recommendations

5.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 8.0k
MMBtu
8.8%
- Electrical $58k 779k
kWh
11.1%
- Natural Gas $16k -
MMBtu
-
Waste $0.1k
Productivity/Other $1.9k
TOTAL $85k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $744k 98k
MMBtu
$9.12
- Electrical $433k 7,608k
kWh
$0.072
- Natural Gas $144k 19k
MMBtu
$6.59

37

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.2k
MMBtu
4.3%
- Electrical $33k 409k
kWh
5.4%
- Natural Gas $5.4k -
MMBtu
-
Waste $0.1k
Productivity/Other $2.2k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall