ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Traveler accommodation
SIC 2+ Digits Required
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $512k 63k
MMBtu
$11.06
- Electrical $285k 4,785k
kWh
$0.081
- Natural Gas $104k 13k
MMBtu
$7.97

120

Recommendations

5.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 5.3k
MMBtu
8.4%
- Electrical $40k 515k
kWh
10.8%
- Natural Gas $13k -
MMBtu
-
Waste $3.9k
Productivity/Other $1.2k
TOTAL $65k
*May be negative reflecting an increased cost component required to save energy and costs overall

13

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $691k 90k
MMBtu
$9.99
- Electrical $402k 7,039k
kWh
$0.079
- Natural Gas $133k 18k
MMBtu
$6.08

37

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 3.9k
MMBtu
4.3%
- Electrical $30k 378k
kWh
5.4%
- Natural Gas $5.0k -
MMBtu
-
Waste $0.1k
Productivity/Other $2.0k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall