ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Accommodation
SIC 2+ Digits Required
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $542k 69k
MMBtu
$10.59
- Electrical $315k 5,390k
kWh
$0.083
- Natural Gas $105k 14k
MMBtu
$7.38

103

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $66k 6.1k
MMBtu
8.8%
- Electrical $45k 595k
kWh
11.0%
- Natural Gas $14k -
MMBtu
-
Waste $0.3k
Productivity/Other $1.4k
TOTAL $68k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $646k 84k
MMBtu
$10.34
- Electrical $375k 6,550k
kWh
$0.084
- Natural Gas $124k 16k
MMBtu
$6.46

42

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 3.6k
MMBtu
4.3%
- Electrical $28k 351k
kWh
5.4%
- Natural Gas $4.6k -
MMBtu
-
Waste $0.1k
Productivity/Other $1.9k
TOTAL $37k