ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fitness and recreational sports centers
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $827k 102k
MMBtu
$10.63
- Electrical $673k 9,537k
kWh
$0.079
- Natural Gas $31k 4.2k
MMBtu
$6.57

16

Recommendations

4.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 3.5k
MMBtu
3.5%
- Electrical $30k 346k
kWh
3.6%
- Natural Gas $2.9k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,876k 365k
MMBtu
$7.89
- Electrical $2,502k 35,563k
kWh
$0.070
- Natural Gas -
-
MMBtu
-

1

Implemented Recommendations

1.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $1.1k 0.1k
MMBtu
0.0%
- Electrical $0.7k 9.6k
kWh
0.0%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $1.1k
*May be negative reflecting an increased cost component required to save energy and costs overall