ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fitness and recreational sports centers
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $712k 88k
MMBtu
$10.12
- Electrical $560k 8,101k
kWh
$0.072
- Natural Gas $40k 4.9k
MMBtu
$7.19

21

Recommendations

4.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.4k
MMBtu
5.0%
- Electrical $31k 426k
kWh
5.3%
- Natural Gas $6.1k -
MMBtu
-
Waste -
Productivity/Other $2.2k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,040k 131k
MMBtu
$10.32
- Electrical $856k 12,283k
kWh
$0.074
- Natural Gas $35k 4.7k
MMBtu
$6.30

6

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 0.4k
MMBtu
0.3%
- Electrical $3.2k 36k
kWh
0.3%
- Natural Gas $1.5k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall