ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other amusement and recreation industries
SIC 2+ Digits Required
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $387k 47k
MMBtu
$11.47
- Electrical $297k 4,245k
kWh
$0.083
- Natural Gas $25k 3.1k
MMBtu
$6.56

42

Recommendations

4.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.5k
MMBtu
5.4%
- Electrical $18k 247k
kWh
5.8%
- Natural Gas $3.2k -
MMBtu
-
Waste -
Productivity/Other $1.2k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $523k 64k
MMBtu
$11.08
- Electrical $410k 5,873k
kWh
$0.083
- Natural Gas $31k 3.7k
MMBtu
$7.00

11

Implemented Recommendations

1.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.8k 0.2k
MMBtu
0.3%
- Electrical $2.0k 21k
kWh
0.4%
- Natural Gas $0.9k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $8.8k
*May be negative reflecting an increased cost component required to save energy and costs overall