ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other amusement and recreation industries
SIC 2+ Digits Required
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $340k 40k
MMBtu
$11.01
- Electrical $250k 3,409k
kWh
$0.090
- Natural Gas $38k 5.0k
MMBtu
$6.88

61

Recommendations

4.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 3.3k
MMBtu
8.3%
- Electrical $31k 322k
kWh
9.5%
- Natural Gas $7.8k -
MMBtu
-
Waste -
Productivity/Other $0.9k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $461k 56k
MMBtu
$11.25
- Electrical $359k 5,154k
kWh
$0.078
- Natural Gas $28k 3.3k
MMBtu
$7.52

12

Implemented Recommendations

1.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $7.8k 0.2k
MMBtu
0.4%
- Electrical $1.7k 20k
kWh
0.4%
- Natural Gas $0.7k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $7.8k
*May be negative reflecting an increased cost component required to save energy and costs overall