ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other amusement and recreation industries
SIC 2+ Digits Required
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $426k 52k
MMBtu
$11.11
- Electrical $327k 4,693k
kWh
$0.076
- Natural Gas $28k 3.4k
MMBtu
$7.29

36

Recommendations

4.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.7k
MMBtu
5.3%
- Electrical $19k 266k
kWh
5.7%
- Natural Gas $3.6k -
MMBtu
-
Waste -
Productivity/Other $1.4k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $523k 64k
MMBtu
$11.08
- Electrical $410k 5,873k
kWh
$0.083
- Natural Gas $31k 3.7k
MMBtu
$7.00

11

Implemented Recommendations

1.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.8k 0.2k
MMBtu
0.3%
- Electrical $2.0k 21k
kWh
0.4%
- Natural Gas $0.9k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $8.8k
*May be negative reflecting an increased cost component required to save energy and costs overall