ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Casinos (except casino hotels)
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $293k 37k
MMBtu
$7.85
- Electrical $263k 3,359k
kWh
$0.071
- Natural Gas $13k 2.1k
MMBtu
$5.37

35

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 7.0k
MMBtu
19.1%
- Electrical $55k 680k
kWh
20.2%
- Natural Gas $5.1k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $293k 37k
MMBtu
$7.85
- Electrical $263k 3,359k
kWh
$0.071
- Natural Gas $13k 2.1k
MMBtu
$5.37

10

Implemented Recommendations

1.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 2.3k
MMBtu
6.3%
- Electrical $19k 225k
kWh
6.7%
- Natural Gas $0.7k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $20k