ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Casinos (except casino hotels)
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $485k 56k
MMBtu
$9.04
- Electrical $441k 5,087k
kWh
$0.085
- Natural Gas $24k 3.9k
MMBtu
$5.17

17

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $115k 12k
MMBtu
21.4%
- Electrical $103k 1,175k
kWh
23.1%
- Natural Gas $12k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $485k 56k
MMBtu
$9.04
- Electrical $441k 5,087k
kWh
$0.085
- Natural Gas $24k 3.9k
MMBtu
$5.17

7

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 4.8k
MMBtu
8.5%
- Electrical $42k 466k
kWh
9.2%
- Natural Gas $1.6k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall