ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Amusement, gambling, and recreation industries
SIC 2+ Digits Required
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $469k 56k
MMBtu
$10.42
- Electrical $387k 5,172k
kWh
$0.083
- Natural Gas $22k 3.1k
MMBtu
$5.97

47

Recommendations

4.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 5.0k
MMBtu
8.9%
- Electrical $42k 487k
kWh
9.4%
- Natural Gas $4.4k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $661k 81k
MMBtu
$10.42
- Electrical $561k 7,490k
kWh
$0.085
- Natural Gas $26k 3.7k
MMBtu
$4.92

15

Implemented Recommendations

2.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.2k
MMBtu
2.8%
- Electrical $20k 217k
kWh
2.9%
- Natural Gas $1.3k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall