ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Amusement, gambling, and recreation industries
SIC 2+ Digits Required
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $341k 42k
MMBtu
$9.85
- Electrical $274k 3,728k
kWh
$0.080
- Natural Gas $24k 3.4k
MMBtu
$6.07

81

Recommendations

4.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.0k
MMBtu
9.5%
- Electrical $30k 388k
kWh
10.4%
- Natural Gas $7.3k -
MMBtu
-
Waste -
Productivity/Other $0.7k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $408k 50k
MMBtu
$9.47
- Electrical $336k 4,616k
kWh
$0.077
- Natural Gas $22k 2.9k
MMBtu
$6.18

21

Implemented Recommendations

1.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 1.3k
MMBtu
2.5%
- Electrical $11k 123k
kWh
2.7%
- Natural Gas $0.8k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $15k
*May be negative reflecting an increased cost component required to save energy and costs overall