ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Amusement, gambling, and recreation industries
SIC 2+ Digits Required
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $314k 38k
MMBtu
$9.89
- Electrical $246k 3,286k
kWh
$0.083
- Natural Gas $28k 3.9k
MMBtu
$6.46

100

Recommendations

4.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.4k
MMBtu
11.7%
- Electrical $38k 429k
kWh
13.0%
- Natural Gas $6.6k -
MMBtu
-
Waste -
Productivity/Other $0.6k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall

15

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $383k 47k
MMBtu
$9.66
- Electrical $314k 4,316k
kWh
$0.074
- Natural Gas $21k 2.8k
MMBtu
$6.52

33

Implemented Recommendations

2.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.6k
MMBtu
3.3%
- Electrical $12k 152k
kWh
3.5%
- Natural Gas $0.7k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $16k
*May be negative reflecting an increased cost component required to save energy and costs overall