ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Zoos and botanical gardens
SIC 2+ Digits Required
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $280k 39k
MMBtu
$8.70
- Electrical $139k 2,452k
kWh
$0.076
- Natural Gas $54k 14k
MMBtu
$3.79

67

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.0k
MMBtu
7.7%
- Electrical $17k 291k
kWh
11.9%
- Natural Gas $7.5k -
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $293k 43k
MMBtu
$8.49
- Electrical $161k 2,719k
kWh
$0.086
- Natural Gas $66k 15k
MMBtu
$4.34

29

Implemented Recommendations

4.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.2k
MMBtu
2.9%
- Electrical $8.9k 120k
kWh
4.4%
- Natural Gas $6.4k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall