ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Zoos and botanical gardens
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $253k 39k
MMBtu
$8.61
- Electrical $125k 2,130k
kWh
$0.091
- Natural Gas $75k 17k
MMBtu
$4.13

37

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 1.9k
MMBtu
4.8%
- Electrical $12k 182k
kWh
8.5%
- Natural Gas $7.8k -
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $253k 39k
MMBtu
$8.61
- Electrical $125k 2,130k
kWh
$0.091
- Natural Gas $75k 17k
MMBtu
$4.13

29

Implemented Recommendations

5.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 1.5k
MMBtu
3.8%
- Electrical $11k 144k
kWh
6.8%
- Natural Gas $7.7k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $22k
*May be negative reflecting an increased cost component required to save energy and costs overall