ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Museums
SIC 2+ Digits Required
3+ Characters Required for Products

13

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $220k 24k
MMBtu
$10.07
- Electrical $138k 2,136k
kWh
$0.080
- Natural Gas $8.0k 1.1k
MMBtu
$3.52

72

Recommendations

5.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.1k
MMBtu
8.8%
- Electrical $16k 209k
kWh
9.8%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other $4.2k
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $260k 29k
MMBtu
$9.94
- Electrical $157k 2,574k
kWh
$0.070
- Natural Gas $7.9k 1.0k
MMBtu
$3.40

23

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 1.5k
MMBtu
5.3%
- Electrical $9.5k 150k
kWh
5.8%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $13k
*May be negative reflecting an increased cost component required to save energy and costs overall