The ITAC Statistics page displays the average assessment results for the selected criteria.
19
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $218k | 27k |
MMBtu
|
$9.75 |
- Electrical | $128k | 2,031k |
kWh
|
$0.084 |
- Natural Gas | $25k | 5.3k |
MMBtu
|
$3.49 |
114
Recommendations
6.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $22k | 2.0k |
MMBtu
|
7.4% |
- Electrical | $15k | 196k |
kWh
|
9.6% |
- Natural Gas | $2.1k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $2.9k | |||
TOTAL | $25k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
16
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $243k | 30k |
MMBtu
|
$9.61 |
- Electrical | $138k | 2,285k |
kWh
|
$0.078 |
- Natural Gas | $28k | 6.0k |
MMBtu
|
$3.41 |
57
Implemented Recommendations
3.6
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $15k | 1.5k |
MMBtu
|
4.9% |
- Electrical | $9.8k | 144k |
kWh
|
6.3% |
- Natural Gas | $2.4k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.2k | |||
TOTAL | $15k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |