ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Museums, historical sites, and similar institutions
SIC 2+ Digits Required
3+ Characters Required for Products

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $240k 29k
MMBtu
$9.52
- Electrical $133k 2,206k
kWh
$0.077
- Natural Gas $28k 5.9k
MMBtu
$3.32

158

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.1k
MMBtu
10.8%
- Electrical $20k 307k
kWh
13.9%
- Natural Gas $8.4k -
MMBtu
-
Waste -
Productivity/Other $2.4k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall

22

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $249k 30k
MMBtu
$9.59
- Electrical $142k 2,330k
kWh
$0.080
- Natural Gas $30k 5.8k
MMBtu
$3.58

72

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.8k
MMBtu
5.9%
- Electrical $12k 176k
kWh
7.6%
- Natural Gas $1.8k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $16k
*May be negative reflecting an increased cost component required to save energy and costs overall