ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 71131 Promoters of performing arts, sports, and similar events with facilities

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $367k 29k
MMBtu
$12.11
- Electrical $134k 1,653k
kWh
$0.079
- Natural Gas $152k 12k
MMBtu
$9.85

13

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 3.5k
MMBtu
12.0%
- Electrical $26k 343k
kWh
20.7%
- Natural Gas $18k -
MMBtu
-
Waste $2.4k
Productivity/Other $0.5k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $161k 14k
MMBtu
$11.22
- Electrical $83k 1,162k
kWh
$0.071
- Natural Gas $16k 2.4k
MMBtu
$6.75

6

Implemented Recommendations

6.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 5.6k
MMBtu
39.1%
- Electrical $39k 548k
kWh
47.1%
- Natural Gas $3.0k -
MMBtu
-
Waste -
Productivity/Other ($-0.4)k
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall