The ITAC Statistics page displays the average assessment results for the selected criteria.
2
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $367k | 29k |
MMBtu
|
$12.11 |
- Electrical | $134k | 1,653k |
kWh
|
$0.079 |
- Natural Gas | $152k | 12k |
MMBtu
|
$9.85 |
13
Recommendations
6.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $53k | 3.5k |
MMBtu
|
12.0% |
- Electrical | $26k | 343k |
kWh
|
20.7% |
- Natural Gas | $18k | - |
MMBtu
|
- |
Waste | $2.4k | |||
Productivity/Other | $0.5k | |||
TOTAL | $56k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
1
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $161k | 14k |
MMBtu
|
$11.22 |
- Electrical | $83k | 1,162k |
kWh
|
$0.071 |
- Natural Gas | $16k | 2.4k |
MMBtu
|
$6.75 |
6
Implemented Recommendations
6.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $60k | 5.6k |
MMBtu
|
39.1% |
- Electrical | $39k | 548k |
kWh
|
47.1% |
- Natural Gas | $3.0k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | ($-0.4)k | |||
TOTAL | $60k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |