The ITAC Statistics page displays the average assessment results for the selected criteria.
5
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $62k | 5.8k |
MMBtu
|
$11.58 |
- Electrical | $42k | 494k |
kWh
|
$0.11 |
- Natural Gas | $5.7k | 0.7k |
MMBtu
|
$7.40 |
25
Recommendations
5.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $24k | 2.4k |
MMBtu
|
41.0% |
- Electrical | $19k | 232k |
kWh
|
46.9% |
- Natural Gas | $0.9k | - |
MMBtu
|
- |
Waste | $0.9k | |||
Productivity/Other | ($-0.1)k | |||
TOTAL | $25k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
4
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $75k | 7.0k |
MMBtu
|
$12.17 |
- Electrical | $50k | 601k |
kWh
|
$0.12 |
- Natural Gas | $6.5k | 0.8k |
MMBtu
|
$6.97 |
13
Implemented Recommendations
3.3
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $21k | 2.0k |
MMBtu
|
28.8% |
- Electrical | $15k | 196k |
kWh
|
32.7% |
- Natural Gas | $0.8k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | ($-0.1)k | |||
TOTAL | $21k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |