ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Community housing services
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $12k 0.6k
MMBtu
$20.71
- Electrical $6.6k 56k
kWh
$0.12
- Natural Gas -
-
MMBtu
-

4

Recommendations

4.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $1.5k 0.1k
MMBtu
17.7%
- Electrical $1.2k 9.8k
kWh
17.7%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $1.6k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $12k 0.6k
MMBtu
$20.71
- Electrical $6.6k 56k
kWh
$0.12
- Natural Gas -
-
MMBtu
-

2

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $0.8k 0.0k
MMBtu
8.0%
- Electrical $0.5k 4.5k
kWh
8.0%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $0.8k
*May be negative reflecting an increased cost component required to save energy and costs overall