ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Services for the elderly and persons with disabilities
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $347k 14k
MMBtu
$24.18
- Electrical $347k 1,398k
kWh
$0.25
- Natural Gas -
-
MMBtu
-

15

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $230k 9.5k
MMBtu
66.5%
- Electrical $230k 930k
kWh
66.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $230k
*May be negative reflecting an increased cost component required to save energy and costs overall

0

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy -
-
MMBtu
-
- Electrical -
-
kWh
-
- Natural Gas -
-
MMBtu
-

0

Implemented Recommendations

0.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy -
-
MMBtu
-
- Electrical -
-
kWh
-
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL -
*May be negative reflecting an increased cost component required to save energy and costs overall