The ITAC Statistics page displays the average assessment results for the selected criteria.
2
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $124k | 12k |
MMBtu
|
$10.70 |
- Electrical | $89k | 916k |
kWh
|
$0.098 |
- Natural Gas | $27k | 2.3k |
MMBtu
|
$13.06 |
11
Recommendations
5.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $49k | 4.4k |
MMBtu
|
37.6% |
- Electrical | $42k | 429k |
kWh
|
46.9% |
- Natural Gas | $3.8k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $49k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
1
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $91k | 8.2k |
MMBtu
|
$11.12 |
- Electrical | $79k | 765k |
kWh
|
$0.10 |
- Natural Gas | $5.7k | 0.4k |
MMBtu
|
$14.85 |
5
Implemented Recommendations
5.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $50k | 4.3k |
MMBtu
|
51.9% |
- Electrical | $43k | 417k |
kWh
|
54.5% |
- Natural Gas | $4.8k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $50k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |