ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Individual and family services
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $235k 13k
MMBtu
$17.44
- Electrical $218k 1,157k
kWh
$0.17
- Natural Gas $13k 1.2k
MMBtu
$6.53

26

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $139k 7.0k
MMBtu
53.5%
- Electrical $136k 680k
kWh
58.7%
- Natural Gas $1.9k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $139k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $124k 12k
MMBtu
$10.70
- Electrical $89k 916k
kWh
$0.098
- Natural Gas $27k 2.3k
MMBtu
$13.06

5

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.1k
MMBtu
18.2%
- Electrical $21k 208k
kWh
22.8%
- Natural Gas $2.4k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall