ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Social assistance
SIC 2+ Digits Required
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $118k 7.4k
MMBtu
$15.10
- Electrical $93k 642k
kWh
$0.12
- Natural Gas $6.3k 0.7k
MMBtu
$4.62

59

Recommendations

5.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 2.7k
MMBtu
36.1%
- Electrical $50k 259k
kWh
40.3%
- Natural Gas $6.2k -
MMBtu
-
Waste -
Productivity/Other $1.5k
TOTAL $59k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $68k 6.1k
MMBtu
$12.19
- Electrical $39k 511k
kWh
$0.088
- Natural Gas $8.3k 0.9k
MMBtu
$5.48

23

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.0k
MMBtu
16.3%
- Electrical $8.9k 97k
kWh
19.0%
- Natural Gas $8.3k -
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $18k
*May be negative reflecting an increased cost component required to save energy and costs overall