ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Social assistance
SIC 2+ Digits Required
3+ Characters Required for Products

15

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $108k 7.3k
MMBtu
$14.17
- Electrical $80k 595k
kWh
$0.11
- Natural Gas $8.8k 1.2k
MMBtu
$5.11

82

Recommendations

5.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 2.7k
MMBtu
37.5%
- Electrical $45k 267k
kWh
44.9%
- Natural Gas $4.8k -
MMBtu
-
Waste -
Productivity/Other $1.3k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $67k 5.8k
MMBtu
$13.08
- Electrical $37k 474k
kWh
$0.091
- Natural Gas $7.7k 0.9k
MMBtu
$5.65

24

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 0.9k
MMBtu
15.3%
- Electrical $7.9k 86k
kWh
18.2%
- Natural Gas $7.4k -
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $16k
*May be negative reflecting an increased cost component required to save energy and costs overall