ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS General medical and surgical hospitals
SIC 2+ Digits Required
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $848k 98k
MMBtu
$9.56
- Electrical $537k 7,310k
kWh
$0.084
- Natural Gas $130k 23k
MMBtu
$5.52

106

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $149k 16k
MMBtu
16.3%
- Electrical $172k 1,558k
kWh
21.3%
- Natural Gas $25k -
MMBtu
-
Waste -
Productivity/Other ($-1.2)k
TOTAL $148k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $720k 87k
MMBtu
$9.32
- Electrical $495k 6,110k
kWh
$0.088
- Natural Gas $128k 24k
MMBtu
$4.13

43

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.9k
MMBtu
5.6%
- Electrical $40k 475k
kWh
7.8%
- Natural Gas $4.6k -
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall