The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC | 2+ Digits Required | |
NAICS | All other outpatient care centers | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
1
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $426k | 53k |
MMBtu
|
$8.05 |
- Electrical | $120k | 3,295k |
kWh
|
$0.036 |
- Natural Gas | $96k | 19k |
MMBtu
|
$4.98 |
6
Recommendations
6.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $105k | (-6.8)k |
MMBtu
|
(-12.8)% |
- Electrical | $4.5k | (-661.7)k |
kWh
|
(-20.1)% |
- Natural Gas | $129k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $105k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
0
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | - | - |
MMBtu
|
- |
- Electrical | - | - |
kWh
|
- |
- Natural Gas | - | - |
MMBtu
|
- |
0
Implemented Recommendations
0.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | - | - |
MMBtu
|
- |
- Electrical | - | - |
kWh
|
- |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | - | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |