ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Outpatient care centers
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $232k 29k
MMBtu
$7.89
- Electrical $67k 1,832k
kWh
$0.036
- Natural Gas $52k 10k
MMBtu
$6.62

7

Recommendations

3.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.0k
MMBtu
10.2%
- Electrical $11k 288k
kWh
15.7%
- Natural Gas $14k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $426k 53k
MMBtu
$8.05
- Electrical $120k 3,295k
kWh
$0.036
- Natural Gas $96k 19k
MMBtu
$4.98

3

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 3.4k
MMBtu
6.3%
- Electrical $12k 328k
kWh
9.9%
- Natural Gas $26k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $59k
*May be negative reflecting an increased cost component required to save energy and costs overall