ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Outpatient care centers
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $182k 22k
MMBtu
$8.63
- Electrical $52k 1,440k
kWh
$0.037
- Natural Gas $38k 7.2k
MMBtu
$7.22

11

Recommendations

3.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.4k
MMBtu
11.0%
- Electrical $6.9k 234k
kWh
16.3%
- Natural Gas $13k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $426k 53k
MMBtu
$8.05
- Electrical $120k 3,295k
kWh
$0.036
- Natural Gas $96k 19k
MMBtu
$4.98

3

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 3.4k
MMBtu
6.3%
- Electrical $12k 328k
kWh
9.9%
- Natural Gas $26k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $59k
*May be negative reflecting an increased cost component required to save energy and costs overall