ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Offices of physicians (except mental health specialists)
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $187k 20k
MMBtu
$9.56
- Electrical $86k 1,497k
kWh
$0.066
- Natural Gas $61k 4.3k
MMBtu
$7.13

33

Recommendations

4.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.8k
MMBtu
14.1%
- Electrical $18k 271k
kWh
18.1%
- Natural Gas $0.9k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $262k 27k
MMBtu
$8.42
- Electrical $105k 1,861k
kWh
$0.060
- Natural Gas $107k 7.4k
MMBtu
$10.21

8

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $6.7k 0.9k
MMBtu
3.4%
- Electrical $6.1k 88k
kWh
4.7%
- Natural Gas $0.4k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $6.7k