ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ambulatory health care services
SIC 2+ Digits Required
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $259k 29k
MMBtu
$9.21
- Electrical $158k 2,273k
kWh
$0.069
- Natural Gas $66k 6.0k
MMBtu
$7.13

46

Recommendations

5.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.3k
MMBtu
11.2%
- Electrical $23k 321k
kWh
14.1%
- Natural Gas $1.9k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $345k 39k
MMBtu
$8.28
- Electrical $206k 2,903k
kWh
$0.067
- Natural Gas $99k 9.0k
MMBtu
$9.18

11

Implemented Recommendations

1.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.6k 1.1k
MMBtu
2.7%
- Electrical $8.1k 104k
kWh
3.6%
- Natural Gas $0.3k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $8.6k
*May be negative reflecting an increased cost component required to save energy and costs overall