ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ambulatory health care services
SIC 2+ Digits Required
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $276k 32k
MMBtu
$9.10
- Electrical $154k 2,375k
kWh
$0.066
- Natural Gas $69k 7.3k
MMBtu
$6.91

50

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.5k
MMBtu
10.9%
- Electrical $23k 339k
kWh
14.3%
- Natural Gas $4.3k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $259k 29k
MMBtu
$9.21
- Electrical $158k 2,273k
kWh
$0.069
- Natural Gas $66k 6.0k
MMBtu
$7.13

28

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 2.2k
MMBtu
7.4%
- Electrical $16k 212k
kWh
9.3%
- Natural Gas $0.3k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $19k