The ITAC Statistics page displays the average assessment results for the selected criteria.
16
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $204k | 29k |
MMBtu
|
$9.17 |
- Electrical | $67k | 915k |
kWh
|
$0.087 |
- Natural Gas | $65k | 13k |
MMBtu
|
$5.11 |
81
Recommendations
5.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $37k | 1.8k |
MMBtu
|
6.1% |
- Electrical | $15k | 174k |
kWh
|
19.0% |
- Natural Gas | $8.8k | - |
MMBtu
|
- |
Waste | $1.3k | |||
Productivity/Other | $8.0k | |||
TOTAL | $47k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
11
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $220k | 34k |
MMBtu
|
$8.79 |
- Electrical | $67k | 1,045k |
kWh
|
$0.065 |
- Natural Gas | $62k | 13k |
MMBtu
|
$5.00 |
16
Implemented Recommendations
1.5
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $24k | 0.6k |
MMBtu
|
1.7% |
- Electrical | $4.1k | 54k |
kWh
|
5.2% |
- Natural Gas | $3.8k | - |
MMBtu
|
- |
Waste | $1.9k | |||
Productivity/Other | $12k | |||
TOTAL | $38k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |