The ITAC Statistics page displays the average assessment results for the selected criteria.
19
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $178k | 26k |
MMBtu
|
$9.24 |
- Electrical | $59k | 800k |
kWh
|
$0.10 |
- Natural Gas | $57k | 13k |
MMBtu
|
$4.46 |
97
Recommendations
5.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $33k | 1.6k |
MMBtu
|
6.0% |
- Electrical | $14k | 153k |
kWh
|
19.1% |
- Natural Gas | $7.5k | - |
MMBtu
|
- |
Waste | $1.1k | |||
Productivity/Other | $6.7k | |||
TOTAL | $41k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
14
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $202k | 30k |
MMBtu
|
$8.79 |
- Electrical | $66k | 971k |
kWh
|
$0.067 |
- Natural Gas | $60k | 13k |
MMBtu
|
$4.90 |
18
Implemented Recommendations
1.3
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $19k | 0.4k |
MMBtu
|
1.5% |
- Electrical | $3.2k | 43k |
kWh
|
4.4% |
- Natural Gas | $3.0k | - |
MMBtu
|
- |
Waste | $1.5k | |||
Productivity/Other | $9.2k | |||
TOTAL | $30k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |