ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Colleges, universities, and professional schools
SIC 2+ Digits Required
3+ Characters Required for Products

17

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $195k 28k
MMBtu
$9.18
- Electrical $64k 885k
kWh
$0.085
- Natural Gas $62k 13k
MMBtu
$4.90

88

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 1.7k
MMBtu
6.1%
- Electrical $14k 165k
kWh
18.7%
- Natural Gas $8.3k -
MMBtu
-
Waste $1.2k
Productivity/Other $7.5k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall

13

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $198k 30k
MMBtu
$8.86
- Electrical $61k 966k
kWh
$0.063
- Natural Gas $54k 12k
MMBtu
$4.81

16

Implemented Recommendations

1.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 0.5k
MMBtu
1.6%
- Electrical $3.4k 46k
kWh
4.7%
- Natural Gas $3.2k -
MMBtu
-
Waste $1.6k
Productivity/Other $9.9k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall