Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Colleges, universities, and professional schools
SIC 2+ Digits Required
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $202k 30k
MMBtu
$8.79
- Electrical $66k 971k
kWh
$0.067
- Natural Gas $60k 13k
MMBtu
$4.90

68

Recommendations

4.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 1.8k
MMBtu
5.9%
- Electrical $13k 173k
kWh
17.8%
- Natural Gas $5.7k -
MMBtu
-
Waste $1.5k
Productivity/Other $9.0k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $240k 40k
MMBtu
$7.86
- Electrical $52k 863k
kWh
$0.061
- Natural Gas $84k 18k
MMBtu
$6.33

14

Implemented Recommendations

1.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 0.7k
MMBtu
1.8%
- Electrical $5.2k 69k
kWh
8.0%
- Natural Gas $5.2k -
MMBtu
-
Waste $2.6k
Productivity/Other $16k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall