The ITAC Statistics page displays the average assessment results for the selected criteria.
12
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $182k | 27k |
MMBtu
|
$7.41 |
- Electrical | $108k | 2,003k |
kWh
|
$0.057 |
- Natural Gas | $36k | 6.2k |
MMBtu
|
$6.55 |
57
Recommendations
4.8
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $26k | 2.5k |
MMBtu
|
9.5% |
- Electrical | $15k | 247k |
kWh
|
12.4% |
- Natural Gas | $8.9k | - |
MMBtu
|
- |
Waste | $0.2k | |||
Productivity/Other | $1.9k | |||
TOTAL | $28k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
9
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $185k | 29k |
MMBtu
|
$7.00 |
- Electrical | $90k | 2,107k |
kWh
|
$0.044 |
- Natural Gas | $45k | 7.6k |
MMBtu
|
$7.73 |
12
Implemented Recommendations
1.3
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $7.3k | 0.9k |
MMBtu
|
3.2% |
- Electrical | $2.9k | 92k |
kWh
|
4.4% |
- Natural Gas | $2.1k | - |
MMBtu
|
- |
Waste | $0.2k | |||
Productivity/Other | $2.5k | |||
TOTAL | $10.0k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |