ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Elementary and secondary schools
SIC 2+ Digits Required
3+ Characters Required for Products

88

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $130k 12k
MMBtu
$11.68
- Electrical $83k 1,003k
kWh
$0.086
- Natural Gas $16k 1.8k
MMBtu
$6.88

456

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.8k
MMBtu
31.1%
- Electrical $30k 370k
kWh
36.9%
- Natural Gas $1.5k -
MMBtu
-
Waste $0.2k
Productivity/Other $1.4k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall

39

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $160k 15k
MMBtu
$11.68
- Electrical $114k 1,230k
kWh
$0.10
- Natural Gas $20k 2.8k
MMBtu
$4.08

117

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 1.9k
MMBtu
12.1%
- Electrical $17k 183k
kWh
14.9%
- Natural Gas $0.8k -
MMBtu
-
Waste $0.0k
Productivity/Other $0.2k
TOTAL $21k