The ITAC Statistics page displays the average assessment results for the selected criteria.
95
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $153k | 17k |
MMBtu
|
$10.78 |
- Electrical | $84k | 1,114k |
kWh
|
$0.084 |
- Natural Gas | $29k | 4.6k |
MMBtu
|
$6.45 |
503
Recommendations
5.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $40k | 3.6k |
MMBtu
|
21.2% |
- Electrical | $29k | 354k |
kWh
|
31.8% |
- Natural Gas | $3.8k | - |
MMBtu
|
- |
Waste | $0.4k | |||
Productivity/Other | $3.1k | |||
TOTAL | $43k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
52
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $179k | 22k |
MMBtu
|
$9.74 |
- Electrical | $99k | 1,404k |
kWh
|
$0.079 |
- Natural Gas | $35k | 6.0k |
MMBtu
|
$5.29 |
132
Implemented Recommendations
2.5
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $21k | 1.6k |
MMBtu
|
7.3% |
- Electrical | $12k | 160k |
kWh
|
11.4% |
- Natural Gas | $1.9k | - |
MMBtu
|
- |
Waste | $0.5k | |||
Productivity/Other | $3.3k | |||
TOTAL | $24k | |||