ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Materials recovery facilities
SIC 2+ Digits Required
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $350k 36k
MMBtu
$11.71
- Electrical $107k 2,522k
kWh
$0.051
- Natural Gas $47k 10k
MMBtu
$6.76

42

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 6.4k
MMBtu
17.7%
- Electrical $27k 629k
kWh
24.9%
- Natural Gas $3.9k -
MMBtu
-
Waste $0.6k
Productivity/Other $7.4k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $222k 28k
MMBtu
$11.60
- Electrical $73k 1,498k
kWh
$0.053
- Natural Gas $52k 12k
MMBtu
$5.70

20

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.8k
MMBtu
6.3%
- Electrical $7.8k 171k
kWh
11.4%
- Natural Gas $4.7k -
MMBtu
-
Waste $0.7k
Productivity/Other ($-0.2)k
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall