The ITAC Statistics page displays the average assessment results for the selected criteria.
6
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $350k | 36k |
MMBtu
|
$11.71 |
- Electrical | $107k | 2,522k |
kWh
|
$0.051 |
- Natural Gas | $47k | 10k |
MMBtu
|
$6.76 |
42
Recommendations
7.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $48k | 6.4k |
MMBtu
|
17.7% |
- Electrical | $27k | 629k |
kWh
|
24.9% |
- Natural Gas | $3.9k | - |
MMBtu
|
- |
Waste | $0.6k | |||
Productivity/Other | $7.4k | |||
TOTAL | $56k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
5
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $222k | 28k |
MMBtu
|
$11.60 |
- Electrical | $73k | 1,498k |
kWh
|
$0.053 |
- Natural Gas | $52k | 12k |
MMBtu
|
$5.70 |
20
Implemented Recommendations
4.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $16k | 1.8k |
MMBtu
|
6.3% |
- Electrical | $7.8k | 171k |
kWh
|
11.4% |
- Natural Gas | $4.7k | - |
MMBtu
|
- |
Waste | $0.7k | |||
Productivity/Other | ($-0.2)k | |||
TOTAL | $17k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |