ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Waste management and remediation services
SIC 2+ Digits Required
3+ Characters Required for Products

19

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $991k 124k
MMBtu
$8.52
- Electrical $549k 8,186k
kWh
$0.059
- Natural Gas $283k 40k
MMBtu
$4.66

97

Recommendations

5.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $79k 11k
MMBtu
8.8%
- Electrical $64k 1,057k
kWh
12.9%
- Natural Gas ($-2.4)k -
MMBtu
-
Waste $2.7k
Productivity/Other $58k
TOTAL $140k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $991k 126k
MMBtu
$8.31
- Electrical $564k 8,217k
kWh
$0.060
- Natural Gas $297k 42k
MMBtu
$4.25

45

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 6.1k
MMBtu
4.8%
- Electrical $44k 592k
kWh
7.2%
- Natural Gas $1.4k -
MMBtu
-
Waste $0.2k
Productivity/Other $49k
TOTAL $99k
*May be negative reflecting an increased cost component required to save energy and costs overall