ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Waste management and remediation services
SIC 2+ Digits Required
3+ Characters Required for Products

20

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $944k 118k
MMBtu
$8.38
- Electrical $523k 7,797k
kWh
$0.059
- Natural Gas $270k 38k
MMBtu
$4.69

104

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $76k 10k
MMBtu
8.7%
- Electrical $61k 1,006k
kWh
12.9%
- Natural Gas ($-1.1)k -
MMBtu
-
Waste $2.6k
Productivity/Other $55k
TOTAL $134k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $991k 124k
MMBtu
$8.52
- Electrical $549k 8,186k
kWh
$0.059
- Natural Gas $283k 40k
MMBtu
$4.66

50

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 6.0k
MMBtu
4.9%
- Electrical $42k 588k
kWh
7.2%
- Natural Gas $1.3k -
MMBtu
-
Waste $0.2k
Productivity/Other $47k
TOTAL $98k
*May be negative reflecting an increased cost component required to save energy and costs overall