The ITAC Statistics page displays the average assessment results for the selected criteria.
4
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $416k | 53k |
MMBtu
|
$8.61 |
- Electrical | $269k | 4,150k |
kWh
|
$0.072 |
- Natural Gas | $90k | 10k |
MMBtu
|
$7.10 |
37
Recommendations
9.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $62k | 5.0k |
MMBtu
|
9.5% |
- Electrical | $45k | 491k |
kWh
|
11.8% |
- Natural Gas | $16k | - |
MMBtu
|
- |
Waste | $1.2k | |||
Productivity/Other | $2.8k | |||
TOTAL | $66k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
4
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $416k | 53k |
MMBtu
|
$8.61 |
- Electrical | $269k | 4,150k |
kWh
|
$0.072 |
- Natural Gas | $90k | 10k |
MMBtu
|
$7.10 |
19
Implemented Recommendations
4.8
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $32k | 3.3k |
MMBtu
|
6.2% |
- Electrical | $22k | 319k |
kWh
|
7.7% |
- Natural Gas | $8.7k | - |
MMBtu
|
- |
Waste | $1.2k | |||
Productivity/Other | $2.8k | |||
TOTAL | $36k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |