ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other support services
SIC 2+ Digits Required
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $715k 77k
MMBtu
$9.49
- Electrical $469k 6,457k
kWh
$0.065
- Natural Gas $77k 8.8k
MMBtu
$7.15

67

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $86k 7.4k
MMBtu
9.7%
- Electrical $54k 725k
kWh
11.2%
- Natural Gas $18k -
MMBtu
-
Waste $0.5k
Productivity/Other $13k
TOTAL $99k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $450k 54k
MMBtu
$8.73
- Electrical $244k 4,192k
kWh
$0.062
- Natural Gas $99k 11k
MMBtu
$7.62

23

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.7k
MMBtu
4.9%
- Electrical $16k 261k
kWh
6.2%
- Natural Gas $7.9k -
MMBtu
-
Waste $0.8k
Productivity/Other $1.9k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall