The ITAC Statistics page displays the average assessment results for the selected criteria.
7
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $417k | 51k |
MMBtu
|
$8.59 |
- Electrical | $238k | 3,969k |
kWh
|
$0.065 |
- Natural Gas | $86k | 9.8k |
MMBtu
|
$8.36 |
50
Recommendations
7.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $60k | 5.3k |
MMBtu
|
10.5% |
- Electrical | $39k | 520k |
kWh
|
13.1% |
- Natural Gas | $16k | - |
MMBtu
|
- |
Waste | $0.7k | |||
Productivity/Other | $1.6k | |||
TOTAL | $62k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
7
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $417k | 51k |
MMBtu
|
$8.59 |
- Electrical | $238k | 3,969k |
kWh
|
$0.065 |
- Natural Gas | $86k | 9.8k |
MMBtu
|
$8.36 |
23
Implemented Recommendations
3.3
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $23k | 2.3k |
MMBtu
|
4.5% |
- Electrical | $14k | 223k |
kWh
|
5.6% |
- Natural Gas | $6.7k | - |
MMBtu
|
- |
Waste | $0.7k | |||
Productivity/Other | $1.6k | |||
TOTAL | $25k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |