ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Administrative and support services
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $417k 51k
MMBtu
$8.59
- Electrical $238k 3,969k
kWh
$0.065
- Natural Gas $86k 9.8k
MMBtu
$8.36

50

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 5.3k
MMBtu
10.5%
- Electrical $39k 520k
kWh
13.1%
- Natural Gas $16k -
MMBtu
-
Waste $0.7k
Productivity/Other $1.6k
TOTAL $62k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $417k 51k
MMBtu
$8.59
- Electrical $238k 3,969k
kWh
$0.065
- Natural Gas $86k 9.8k
MMBtu
$8.36

23

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.3k
MMBtu
4.5%
- Electrical $14k 223k
kWh
5.6%
- Natural Gas $6.7k -
MMBtu
-
Waste $0.7k
Productivity/Other $1.6k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall