ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Management of companies and enterprises
SIC 2+ Digits Required
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $210k 18k
MMBtu
$10.65
- Electrical $129k 1,509k
kWh
$0.084
- Natural Gas $20k 2.8k
MMBtu
$5.12

105

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $90k 7.6k
MMBtu
41.7%
- Electrical $61k 745k
kWh
49.4%
- Natural Gas $2.9k -
MMBtu
-
Waste $0.2k
Productivity/Other $7.4k
TOTAL $98k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $229k 20k
MMBtu
$10.84
- Electrical $143k 1,648k
kWh
$0.088
- Natural Gas $20k 2.8k
MMBtu
$4.84

45

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 1.6k
MMBtu
8.2%
- Electrical $14k 157k
kWh
9.5%
- Natural Gas $1.6k -
MMBtu
-
Waste $0.0k
Productivity/Other $2.3k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall